Case Studies

CLIENT: Simon Dickenson

By September 17, 2020 September 21st, 2020 No Comments

SITE: Jubilee Mill, Padiham

PROPOSALS:

The engine house is set to be converted to rental properties.

BRIEF:

Perform a phase 1 contaminated land assessment.

BEK WORK:

BEK have recently completed Phase 1 Site Investigation at a historic site in Padiham. Although prior to recent demolition the site was disused, it has a deep heritage within Lancashire, once housing over 1000 looms, powered by one of the quintessential historic engines developed by W&J Yates of Blackburn; the engine is now located in Bath and is designated an ancient monument. The assessment has ensured the site can be safely redeveloped for residents.

Leave a Reply